RFP for Completion of EPC for a 3MW Solar Facility Located on a Closed Landfill in the City of Ontario, California

PVNavigator, LLC ("PVN") is soliciting turnkey proposals for completion of engineering, procurement, and construction ("EPC") of a 3MW (AC) fixed tilt, utility-scale, photovoltaic (PV) solar energy generating facility ("Project"). PVN specialized in the development of utility scale, PV solar power projects at landfill sites and on formerly environmentally impacted lands. The Project will be located on San Bernardino County-owned landfill site located in the City of Ontario, California.

PVN will evaluate all Proposals which follow the required Proposal Format, using evaluation criteria such as: the overall proposed cost of the Project (and its component phases), company’s solar and facility construction experience, company’s construction safety record, company’s ability to meet the facility’s Commercial Operation Date (COD), and the ability of the Bidder to guarantee the electrical output of the solar facility

Electronic copies of the RFP and all associated documents can be downloaded at PVNavigator.com.  Although not required to submit a proposal for the project, PVN would appreciate it if Bidders returned an Expression of Interest Form via email or fax to Robert Potter or (714) 388-1839 by December 31, 2015.

Proposals shall be presented in accordance with the specified RFP requirements. A Pre-Proposal meeting via WebEx is tentatively scheduled for 10a.m. PST January 5, 2016, and a site visit is scheduled for January 7, 2016 at the Landfill. Exact details of the meetings and any RFP updates will be sent out to all Bidders who have returned an Expression of Interest Form.

To be considered, 1 digital copy and 4 hard copies of your Proposal shall be submitted no later than 5 p.m. PST, January 19, 2016 to:

Robert Potter

PVNavigator, LLC

1 Pointe Drive, Suite 320

Brea, CA 92821

Questions must be addressed in writing to PVNavigator, LLC via email to Robert Potter.